We have officially started the development work on the new residential development (Phase 1) which will include homes north of the current Clubhouse location. In addition, we will construct two new golf holes and a beautiful short game area featuring a practice chipping and bunker area along with a fantastic (large) new practice putting green. It is our hope that if all goes well that we will be using the new short game area and practice putting green as early as late spring, 2019.

Over the next several months we will be doing a significant amount of earthwork in preparation of the homesites and golf holes. You will see dramatic changes to the area north of 161st Street. The practice range is no longer in use and we have set up a hitting net for you to hit balls prior to commencing play on the golf course.

You can refer to this as your informational page that will assist you in understanding all that is happening, as well as photos to keep you abreast of the progress on the project.

A temporary parking lot will be prepared just north and west of the current west parking lot. The temp parking lot should be ready for use within the next week. For a short period of time we will be utilizing the current main entrance as both an entrance and exit to Wood Wind. This will be short term until we have the temp parking lot complete. We will then have an exit to Towne Road to ease the confusion at the main entrance.

The two new golf holes have been designed by local golf course Architect Ron Kern. Ron has also designed the new short game area and practice putting green. You will love it!

Lastly, we will have in the Clubhouse a conceptual layout of the project to assist you. If you have any questions, please feel free to ask Head Golf Professional, This email address is being protected from spambots. You need JavaScript enabled to view it. or email This email address is being protected from spambots. You need JavaScript enabled to view it., who will be the project manager for Cohoat and O’Neal.
 

 

 

Phase 1

Photos (9/17/2018)

 
Infastructure work continuesClearing and grading work continutes for new golf holes and residential sites
Clearing and grading on golf holes and residential work continues
 
The pond behind the Pavilion has been filled to make way for development
Pond 2Pond 2
 
Clearing and detention area is progressing on 2nd new golf hole, Par 4
Clearing and detention progress on 2nd new golf hole par 4
 
Storm drain work on the maind drive continues to make strides
Storm Drin on main drive
 
Dry detention west of 2nd new golf hole is taking shape
Dry Detention West of 2nd new golf hole is taking shape
 
Our new irrigation mainline to proveide water to the new golf holes and new short game facility started Monday, September 14th!
Mainline
 

Photos (8/31/2018)

Infastructure work continues
 Infastructure continuesInfastructure continues 
 
Beginning the process to build the new homesite pads
Beginning the porcess to build homesite pads 
 
Looking to the northwest over the new Main Drive at homesites and new golf holes.
9 
 
Clearing land for homesites and new golf holes
 Clearing land for homes and new golf holes
 
The view from the tee of the 1st new golf hole, a 175 Yard Par 3. The angle is directly towards the tallest tree limbs in the middle of the photo.
 11
 
Current view from the tee of the 2nd new golf hole.... This is the "before" and we can't wait for the "after"!
 Current view of the second tee looking south This is before and we cant wait to see after
 
Looking north back on the 2nd new golf hole. The Par 4 will play from north to south back towards 161st Street. 
 7
 
The tree line & Out-of-Bounds will be just to the left of the fairway.
6
 
Homesite locations east of the new Main Drive
 Homesite location east of the main drive
 
Residential work continues
 10
 
Looking north from the new Main Drive with homesites to the left and right.
8 
 
 

 

Photos (8/24/2018)

 
Our temporary parking is complete
New Parking Lot Striped
New Temporary Parking Lot complete with Vehicles
 
Trees have been cleared to make room for a new golf hole to the east of the old Practice Facility.
 Trees being to the east of the old Practcie Facility to make room for a new hole hole
 
Heavy machinery is on the move to begin shaping!
 Shaping has Begun on the Range
Shaping 2
 
 
 
 

Photos (8/17/2018)

Our Practice Facility is closed for construction

Pracitice Facility Closed

Equipment is being staged to the west of where the range was in preparation of earth movement for the new Practice Facility, (2) new golf holes, and the housing addition.

Staging of Equipment West of the Range

 

A hitting net has been installed next to the 1st tee for warmup shots

Hitting Net

 

We no longer have an east exit

We no longer have an East Exit

 

Millings from the old east exit will be used for our new temporary parking lot to the west of the Cart Barn.

Millings will be used for new Temporary ParkingGriding up old Exit

 The old "Lean To" built on the Cart Barn was prepped for demolititon to make space for the new temporary parking lot. This demolition started Friday, August 17th.

Lean To Ready for DemoDumpsters for LEan to DemoDemolition of the Lean To next to our Cart Barn